大跨度钢拱肋整体吊装施工  被引量:1

Integral Hoisting Construction of Large-span Steel Arch Rib

在线阅读下载全文

作  者:徐新华 王克军 张青 

机构地区:[1]上海浦东路桥建设股份有限公司,上海市201203

出  处:《城市道桥与防洪》2009年第10期90-92,共3页Urban Roads Bridges & Flood Control

摘  要:大跨度钢拱肋在以前大都是分三到五段吊装,在空中进行拼接。这种吊装方法的缺点是:(1)在河道中搭设临时支撑,会影响河道通航;(2)施工工期长;(3)空中拼接时,接头的焊缝质量没有在地面焊接好;(4)空中作业多,安全风险增大。该文介绍了上海川杨桥的83m跨系杆拱桥钢拱肋采用整体吊装施工工艺,较好地解决了上述问题。该施工工艺对今后类似工程的施工有一定的参考价值。The large-span steel arch rib was mostly divided into three to five segments to hoist and to do the airborne splicing construction before.There are four shortcomings of this hoisting method:(1) the temporary support in the river hinders the navigation service in the river course;(2) it takes a long construction time;(3) the quality of welded joint in airborne splicing is not as good as the quality welded on the ground;(4) the airborne work increases the security risks.The article introduces an integral hoisting construction method used for the steel arch rib of 83-m-span bowstring arch bridge of Shanghai Chuanyang River Bridge,which better solves the above problems and has some referring value for the construction of the similar projects.

关 键 词:系杆拱桥 大跨度 钢拱肋 整体吊装 空中翻身 长清路川杨河桥 上海 

分 类 号:U448.22[建筑科学—桥梁与隧道工程] U445[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象