检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]辽宁省水利厅,辽宁沈阳110003 [2]辽宁省水利水电科学研究院,辽宁沈阳110003 [3]辽宁省水利水电勘测设计研究院,辽宁沈阳110003
出 处:《东北水利水电》2009年第9期14-15,共2页Water Resources & Hydropower of Northeast China
摘 要:采用跨流域调水工程是解决资源性缺水的重要手段。跨流域调水工程规模的确定,既关系到调出区未来发展对水资源的需求问题,也关系到工程建设的经济合理性问题。本文结合某跨流域调水工程实例,通过调出水资源量分析,调水规模与供水量关系分析,以及调水规模单方水投资分析,确定经济合理的工程规模。The inter-basin water transfer project is the important means to solve the resources water shortage.Determining the project scale not only relate the water demand for exporting region in the future development,but also relate the economic rationality of project construction.Combined with the example of a certain interbasin water transfer project,the paper determines the economic and rational project scale by analyzing the water quantity in diversion area,the relation between water transfer scale and water supply quantity and unilateral investment of water transfer scale.
分 类 号:TV213.2[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117