调水工程调水规模分析  被引量:2

Water transfer scale analysis of water transfer project

在线阅读下载全文

作  者:王永宁 黄为[2] 韩义超[3] 

机构地区:[1]辽宁省水利厅,辽宁沈阳110003 [2]辽宁省水利水电科学研究院,辽宁沈阳110003 [3]辽宁省水利水电勘测设计研究院,辽宁沈阳110003

出  处:《东北水利水电》2009年第9期14-15,共2页Water Resources & Hydropower of Northeast China

摘  要:采用跨流域调水工程是解决资源性缺水的重要手段。跨流域调水工程规模的确定,既关系到调出区未来发展对水资源的需求问题,也关系到工程建设的经济合理性问题。本文结合某跨流域调水工程实例,通过调出水资源量分析,调水规模与供水量关系分析,以及调水规模单方水投资分析,确定经济合理的工程规模。The inter-basin water transfer project is the important means to solve the resources water shortage.Determining the project scale not only relate the water demand for exporting region in the future development,but also relate the economic rationality of project construction.Combined with the example of a certain interbasin water transfer project,the paper determines the economic and rational project scale by analyzing the water quantity in diversion area,the relation between water transfer scale and water supply quantity and unilateral investment of water transfer scale.

关 键 词:调水工程 调水量 供水量 规模分析 

分 类 号:TV213.2[水利工程—水文学及水资源]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象