利用国内现有装备安装海上风机的可行性调研  被引量:3

Feasibility study on offshore wind turbine installation with existing domestic equipment

在线阅读下载全文

作  者:莫为泽[1,2] 冯宾春[1,2] 马素萍[1,2] 

机构地区:[1]中国水利水电科学研究院,北京100038 [2]北京中水科水电科技开发有限公司,北京100038

出  处:《水利水电技术》2009年第9期28-31,共4页Water Resources and Hydropower Engineering

基  金:"十一五"国家科技支撑计划课题"近海风电机组施工;测试专用设备的研制"(2006BAA01A27)

摘  要:我国近海风电可装机容量约为100~200 GW,东海大桥海上风电示范项目正在建设,若干个海上示范风电场的前期规划和选址工作也已启动。通过对国内浮船坞、海洋平台、起重船、打桩船的调查,初步探讨了利用国内现有装备安装海上风机的可行性。The installable capacity for the offshore wind power generation in China is about 100 -200 GW, and a demonstration project--Donghai Bridge Offshore Wind Farm Project is now being constructed along with the start-up of both the pre-phase plan- ning and the site-selection for a number of demonstration offshore wind farms. Based on the investigation on the floating docks, offshore platforms, crane barges, pile driving barges in China, the feasilbility to utilize the existing domestic equipments for in- stallation of the offshore wind turbines is discussed herein as well.

关 键 词:海上吊装设备 海上风机安装 可行性调研 近海风力发电 

分 类 号:TM614[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象