检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东工业大学自动化学院电力工程系,广东广州510006 [2]广东惠州天然气发电有限公司,广东惠州516082
出 处:《广东电力》2009年第9期1-5,共5页Guangdong Electric Power
基 金:广东省教育厅电力节能与新能源技术重点实验室资助项目(IDSYS200701)
摘 要:通过对天然气联合循环发电上网电价的试算,提出联合循环发电的成本构成计算方法。在计及联合循环发电环境效益及上网分时电价的基础上,对天然气联合循环发电的综合价值进行分析,提出了燃气-蒸汽联合循环电厂调峰运行时上网电价的计算方法及合理的年利用小时数。The paper proposes the calculating method of combined-cycle power generation cost based on the tentative calculation of the liquefied natural gas (LNG) combined-cycle generation price to grid. Taking the environmental benefits of combined-cycle power generation and the on-grid time-of-use (TOU) power price into consideration, the paper analyzes the integrated value of LNG combined-cycle power generation, and presents the calculation method of electricity price to grid during peaking operation of gas-steam combined-cycle power plant and the reasonable annual utilization hours.
分 类 号:TM619[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30