作 者:魏书智
机构地区:[1]昭平下福水电站工程指挥部,广西昭平546800
出 处:《广西水利水电》2009年第5期54-55,共2页Guangxi Water Resources & Hydropower Engineering
摘 要:介绍下福水利枢纽二期工程施工的主要内容及特点。针对工程利用二期围堰挡水、通航、发电,且要求在一个枯水期内完成的实际,论述了在工程量大,工期紧的情况下施工中采取的方案与对策。An introduction was made on the components and features of the 2nd-stage works of Xiafu Hydraulic Complex. It had been planned to utilize the 2nd-stage cofferdam to retain water for navigation and power generation, while the construction of 2nd-stage works was scheduled be completed within one dry-period. In view of these requirements, the author discussed the scheme and countermeasures which had been adopted for finishing construction of great quantities in short period.
分 类 号:TV551.1[水利工程—水利水电工程]