A/三级MBBR法处理炼油废水的中试研究  被引量:4

Pilot Research of Oil Refinery Wastewater Treatment by the Combination Process of A/three MBBR

在线阅读下载全文

作  者:袁志宇[1] 刘锋[2] 陆大培[1] 

机构地区:[1]武汉理工大学设计研究院,湖北武汉430070 [2]中铁第四勘察设计院集团有限公司,湖北武汉430063

出  处:《精细化工》2009年第10期1016-1018,共3页Fine Chemicals

摘  要:在容积为10.5 m3的装置中,采用A/三级MBBR工艺对炼油废水的处理进行了中试研究。考察了中试装置对炼油废水中CODCr、NH4+—N的去除率。结果表明,采用A/三级MBBR工艺生化反应停留时间(14.3 h)远低于现有炼油废水处理厂的生化反应停留时间(66 h),对COD和NH4+—N的平均去除率分别达到92.4%和99.8%,具有处理效率高、停留时间短的特点,出水水质达到了《国家综合排放标准》(GB8978—1996)中的一级排放标准。The combination process of A/three MBBR was used to treat the oil refinery wastewater.In this pilot research,the removal rate of the CODCr & ammonia nitrogen are investigated.The results indicate that in the process of A/three MBBR the removal efficiency of the COD and NH4+—N are 92.4% and 99.8% on the condition of HRT 14.3 h,which is much lower than 66 h.The combination process has the features of high removal rate and low HRT.The outwater quality could reach the first level of emission standards《National Comprehensive Emission Standard《( GB8978--1996 ).

关 键 词:MBBR 炼油废水 去除率 水处理技术与环境保护 

分 类 号:X742[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象