检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水电自动化与大坝监测》2009年第5期69-71,共3页HYDROPOWER AUTOMATION AND DAM MONITORING
摘 要:原大黑汀大坝进行垂直位移监测时,在精度评定过程中,套用精度指标ukm和u站的计算公式,将坝顶的全部测站合并作为一个测段(测站),存在一定的偏差,导致计算结果错误。针对该计算中的不足和问题,结合工程实际情况,提出一种新的精度评定方法,将固定的每2个标点间作为一段,参与精度指标计算。新方法更为合理、有效,能够对垂直位移监测的精度进行准确评定。In the accuracy evaluation of the vertical displacement measurement for the Daheiting dam, the accuracy index formula is used while all the measuring stations are regarded as a measuring segment, leading to certain deviation. Aiming at the defect in vertical displacement accuracy evaluation, in combination with the actual situation, a new vertical displacement measurement method is presented. Each section between two fixed points are taken as a segment in the calculation of the accuracy index. The new method is more reasonable and valid and can be used for the evaluation of the precision of dam vertical displacement measurement.
分 类 号:TV698.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.135.221