检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北石油管理局井下作业公司
出 处:《石油钻采工艺》1998年第4期1-8,79,共9页Oil Drilling & Production Technology
摘 要:华北油田任平2井177.8mm技术套管下至3150.36m潜山顶部,然后用152.4mm钻头增斜和水平钻至井深3483m。根据测井资料,用3个封隔器和2个CMD滑套的完井管柱将目的层分为两段,先用换位工具将上、下两段的滑套都打开进行合试,然后关闭上段滑套只对下段试油,后又进行了酸化。实践证明,选择性完井工艺是成功的。文中介绍了选择性完井管柱各工具的结构、功能,并详细介绍了在任平2井的使用情况。In Well Renping 2 of Huabei oil field, the intermediate casing was set to the top of buried hill at 3150. 36 m, then the build up and horizontal sections were drilled with 152. 4 mm bit to 3483 m. A completion string consisted of 3 packers and 2 CMD slide sleeves was used to divide the target interval into two sections. A commingled production test was done with both slide sleeves open by the position switch tool, then only the lower section was tested with the lower slide sleeve closed and an acidizing was applied finally. The prac-tice proved the selective completion technique successful. This paper describes the structure and function of various tools in the selective completion string and presents in detail its appli-cation in Well Renping 2.
分 类 号:TE257.9[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185