检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]辽河石油勘探局勘探开发研究院,辽宁盘锦124010
出 处:《特种油气藏》1998年第3期40-43,49,共5页Special Oil & Gas Reservoirs
摘 要:方法利用注采特征曲线,对锦45块“八五”期间新增可采储量进行了计算研究。目的研究蒸汽吞吐阶段增加可采储量的途径,为同类油藏的合理开发提供依据。结果蒸汽吞吐阶段增加可采储量的三项技术途径:一是加大滚动勘探开发力度,不断发现和投入新储量;二是开展油藏工程研究,搞清油水分布,合理部署调整井;三是综合治理,增加可采储量。结论“八五”期间,利用上述技术途径,改善了锦45块开发效果。新增可采储量271×104t。Method Additional recoverable reserves during the Eighth-- Five-- Year Plan is calculated for fault block Jin 45 by using injection-production characterlzatlon curves. PurposeTo study the way to add recoverable reserves in steam soaking period in order to provide basis for reasonable development of similar reservoir. Result There are three ways to add recoverable reserves in steam soaking period. They are as follows: to have further step on progressive exploration and development. To conduct reservoir engineering sutdy to make sureof the oil water distribution and plan the adjustment well reasonably. To conduct integratedmanagement to add recoverable reserves. Conclusion During the Eighth-Five-Year Plan,the development of fault block Jin 45 improved by the above mentioned technique and additional recoverable reserves of 2. 71 million tons.
分 类 号:TE15[石油与天然气工程—油气勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117