矿业权核查工作流程与实现——以辽宁省铁岭县矿业权核查工作为例  被引量:5

PROCESS AND REALIZATION OF MINING RIGHT CHECKING:A case study of Tieling County,Liaoning Province

在线阅读下载全文

作  者:焦殿阳 王文清 赵雪芹 

机构地区:[1]辽宁省地质矿产调查院,辽宁沈阳110032

出  处:《地质与资源》2009年第3期237-240,共4页Geology and Resources

基  金:中国地质调查局地质大调查项目"全国矿产资源勘查与开发现状调查"(编号:中地调研合同[2008]第165;197号)资助

摘  要:矿业权实地核查工作流程主要包括前期准备工作、控制测量、矿权坐标转换、矿区控制加密与工程测量、问题分析-报告与处理、露天采矿权界桩测设、内业数据整理、提交成果等8个环节.其中控制测量、矿权坐标转换、矿区控制加密与工程测量是矿业权核查工作过程中的关键环节.The mining right check processing is summarized with a case study of Tieling County, Liaoning Province. The process of mining right checking in the field consists of mainly eight steps, including pre-work preparation, controlling measurement, coordinate conversion of mining right, orefield control densification and engineering measurement, problem analysis-reporting and disposal, boundary peg setting and embedding in the open air, indoor coordination of data, and result referring. Among them, controlling measurement, coordinate conversion of mining right, orefield control densifieation and engineering measurement are the key steps during the realization of mining right checking process.

关 键 词:矿业权核查 工作流程 控制测量 矿权坐标转换 矿区控制加密 

分 类 号:P621[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象