作 者:李春林[1,2] 李天斌[2] 陈礼伟[1] 翟小平[3]
机构地区:[1]中铁西南科学研究院有限公司,成都610031 [2]成都理工大学地质灾害防治与地质环境保护国家重点实验室,成都610059 [3]四川省蜀通岩土工程公司,成都610041
出 处:《现代隧道技术》2009年第5期46-50,共5页Modern Tunnelling Technology
摘 要:在我国西部山区修建高速公路过程中常选择隧道方案,从而各类特长深埋、复杂地质条件下的隧道工程大量涌现,在施工过程中常出现各种隧道灾害。针对在建的都(江堰)-汶(川)公路龙溪隧道工程中频繁出现的围岩大变形而导致初期支护侵限现象,基于现场测试资料,采用地质分析法和连续介质力学分析法,准确的获取了左线试验段围岩大变形的主要成因:倾向隧道右侧的软岩地层在高地应力(作用方向近垂直岩层)作用下产生较大变形。Mountain tunnels are deep buried with complicated geological conditions, various disasters have been encountred in their construction process. Large deformations of surrounding rocks often caused primary support intruding into the tunnel clearance. In order to reveal the genetic mechanism of the large deformations of surrounding rocks, a test section was set in Longxi left tunnel on Du-Wen highway. Based on the in-situ measurement data, by adopting geologic analysis incorporating finite element analysis, the main cause of the large deformation of surrounding rocks on the left line test section was revealed: under the action of high initial stresses, soft rock mass with large deformation tends to obliquely shift toward right.
分 类 号:U451.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70