整体升降脚手架与垂直运输施工机械的协调性  被引量:2

CONCORDANCE BETWEEN INTEGRATED LIFT SCAFFOLD AND VERTICAL TRANSPORT CONSTRUCTION MACHINERY

在线阅读下载全文

作  者:李明[1] 

机构地区:[1]江苏省建筑科学研究院

出  处:《建筑技术》1998年第9期620-622,共3页Architecture Technology

摘  要:一些整体升降脚手架施工方案在制定时,因未考虑大型垂直运输机械的平面位置及附墙杆立面安装尺寸等因素,造成机位布置不合理而导致碰撞。对此应根据垂直运输机械的附墙尺寸和平面选位原则,加强整体升降脚手架与垂直运输机械的协调性。During the designing and making of construction program,because of negligence to take proper care of the placement of large-scale vertical transport construction machinery and the installation sizes of integrated lift scaffold,as a result,it is bound to have troubles and run into bumps and collisions.Therefore,the placements and installation sizes of them all should be carefully designed;and the concordance between integrated lift scaffold and vertical transport construction machinery would be enhanced,so that the construction security could be eventually guaranteed.

关 键 词:整体升降 脚手架 垂直运输机械 附墙杆 协调性 

分 类 号:TU731.2[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象