CTCS-3级列控系统测试案例生成方法的研究  被引量:13

Test Case Producing Manner of CTCS Level 3 Train Control System

在线阅读下载全文

作  者:季学胜[1] 李开成[2] 张勇[2] 刘大为[1] 

机构地区:[1]中华人民共和国铁道部科技司 [2]北京交通大学电子信息工程学院

出  处:《铁道通信信号》2009年第10期1-5,共5页Railway Signalling & Communication

摘  要:CTCS-3级列控系统是保障铁路行车安全、提高运输效率的重要设备,上道运用前必须在实验室和现场分别进行功能测试,建立CTCS-3级列控系统测试案例库对CTCS-3级列控系统的功能测试具有非常重要的意义。分析了系统需求规范、功能特征和测试案例之间的关系,研究了从系统需求规范和总体技术方案提取功能特征的方法和测试案例的生成方法。CTCS level 3 train control system is one of the most important equipment to assure the safety of train operation and to enhance the efficiency of traffic. It is very significant to establish the test case aggregation for the function test of the system. In this paper, the authors analyzed the relationship among the system requirement specification, function features and the test case. Furthermore, the method to abstract function features from the system requirement specification and the general technical scheme was researched. The procedure to build the test cases is also described in this paper.

关 键 词:列控系统 测试案例 功能特征 

分 类 号:U284.91[交通运输工程—交通信息工程及控制]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象