厚大冲洪积层上水下抛石基床综合施工技术  

Synthesis Construction Technique of Rubble-mound Foundation Under the Thick Favorable Opposition Diluvium Layer

在线阅读下载全文

作  者:秦国刚 

机构地区:[1]中铁十三局集团第四工程有限公司,黑龙江哈尔滨150008

出  处:《杨凌职业技术学院学报》2009年第4期60-63,共4页Journal of Yangling Vocational & Technical College

摘  要:大顶子山船闸上下游隔流堤、靠船墩均为抛石基床结构,抛石11万m3,其中水下6.7万m3。水下抛石高差难控制,抛石夯实质量不易保障,基床粗平和细平的平整度控制难度大。通过夯实试验,摸索出一整套基床整平的施工技术,解决了水下抛石基床施工质量控制等难题,并总结出一整套水下抛石基床施工技术并积累了经验。Ship Lock upstream and downstream at Dadingzishan separation levee approach channel of TGP and pier structure both are rubble-mound foundation, rubble-mound is about 110,000 m^3, of which 67,000 m^3 is underwater. Refractory elevation of Rubble-mound is very hard to be controlled underwater, and the compacted quality of rubble-mound is not to be ensured, meanwhile, the foundation roughness control is very difficult. Through the compact test ,the author explores a set of leveling the base of the construction techniques to solve the underwater construction of rubble-mound foundation quality control problems, and summarizes a set of underwater construction of rubble-mound foundation technology and accumulated experi- ence.

关 键 词:抛石基床 洪积层 施工技术 

分 类 号:U615[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象