作 者:吴涛[1] 苏为民[1] 王蓓[2] 王征[2] 姚谦[1] 高洵[2]
机构地区:[1]华北电力科学研究院有限公司,北京100045 [2]华北电力调度通信中心,北京100051
出 处:《中国电力》2009年第11期41-47,共7页Electric Power
摘 要:为提高电网的输送能力,电力系统中大量采用了串联电容补偿技术,但串补设备投运后可能产生的次同步谐振(SSR)问题引起了广泛关注。附加励磁阻尼控制(SEDC)是抑制SSR的措施之一。从SEDC抑制效果及对常规励磁系统特性的影响等方面,对SEDC技术进行实验研究。并结合500kV串补装置与上都电厂SEDC装置的联合调整试验,仿真研究了SEDC装置投运后电力系统的稳定特性。The technique of series capacitor compensation had been applied recent years to improve transmission ability of power grids. Subsynchronous resonance (SSR) between the rotor shaft of a generator and the power network in a series capacitor compensated transmission project had been paid a high attention widely. Supplementary excitation damping control (SEDC) was proved an approach to inhibit SSR. Firstly, SEDC' s inhibiting ability and its interaction with AVR characteristic were tested. Then, combined with the union test of 500 kV capacitor compensation and SEDC in Shangdu power plant, power system stability after SEDC put into operation was simulated.
关 键 词:电网输送能力 串联电容补偿 次同步谐振(SSR) 附加励磁阻尼控制(SEDC) 发电机励磁系统
分 类 号:TM712[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30