检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团西北勘测设计研究院,陕西西安710065
出 处:《水力发电》2009年第11期16-18,73,共4页Water Power
摘 要:拉西瓦拱坝是建在高寒、较高海拔地区的250 m高薄拱坝,坝身布置有表、深、底孔泄水孔口,坝体结构受力复杂。安全监测设计主要根据坝址区工程条件和结构设计成果,遵循相关规范和经验选择监测部位和监测项目,设计中考虑了施工期、蓄水过程和永久运行各阶段的需要,提出了系统的安全监测设计方案,并在拉西瓦拱坝施工期和初期运行阶段发挥了重要作用。The double-curvature arch dam of Laxiwa Hydropower Station is 250 m high which is built in a cold, higher altitude area. The stress status of dam body is very complicated because of the layout of surface, deep and bottom outlets in dam body. Dam monitoring positions and items are selected according to engineering condition of dam site and structural design of dam, and in compliance with relative specification and experience. After considering the requirements of construction term, impounding process and permanent operation, dam monitoring system is designed and has played an important role during construction and initial operation period.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222