检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张宝声[1]
出 处:《中国三峡建设》1998年第9期30-31,33,共3页China Three Gorges Construction
摘 要:三峡工程实行“静态控制,动态管理”的造价管理和控制体系;采用合理确定造价,有效控制与实施全程动态管理的方法;编制业主执行概算作为造价管理和控制的主要依据;制定枢纽工程价差计算办法来规范价差补偿工作。A cost control and management system characterized by 'static control &dynamic managemment' has been applied in the construction of the Three Gorges Project. An approach has been employed combining reasonably fixing of costs with effectively control and implementation of dynamic all - around process management. Anexecutive estimate compiled by the Owner is specified as the major grounds for costcontrol and management. The price compensation is standardized based on the establishment of price difference computation paractice for the main works.
分 类 号:TV51[水利工程—水利水电工程] TV632.63
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15