检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华南理工大学亚热带建筑科学国家重点实验室,广东广州510640 [2]中航勘察设计研究院,北京100098
出 处:《岩石力学与工程学报》2009年第11期2242-2248,共7页Chinese Journal of Rock Mechanics and Engineering
摘 要:广州猎德大桥水中桥墩的支护方案采用钢板桩+钢支撑的支护体系,设计中采用钢管桩对钢板桩底部护脚的方法,解决钢板桩围堰可能由于嵌固深度不够而发生桩底位移过大的失稳破坏的问题,使工程顺利实施,为钢板桩在类似地质条件下的应用提供经验。施工监测中为监测钢板桩桩底位移过大(踢脚)的情况,采用监测对撑两端钢板桩相对位移变化的方法来预测踢脚情况。设计和监测方法均取得较好的效果。The cofferdams of Liede bridge pier are retained by steel sheet pile and steel struts structure. Steel pipe piles are used to support the bottom of steel sheet pile to avoid excessive bottom displacement and cofferdams unstability due to less embedment length of steel sheet pile cofferdams. The method to ensure safety of cofferdams not only assists the achieving of the project successfully, but also offers the experience for the application of steel sheet pile on the similar geologic conditions. To find out excessive displacement of bottom of cofferdams, relative displacement of steel sheet piles locating two ends of steel struts is monitored. Technique of design and monitoring is effective.
关 键 词:水利工程 钢板桩围堰 嵌固深度 桩底位移 底部护脚 监测
分 类 号:TV61[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222