检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国石油大学地球资源与信息学院,山东青岛266555
出 处:《测绘科学》2009年第6期187-189,共3页Science of Surveying and Mapping
基 金:山东省科技攻关项目(2008GG10009018)
摘 要:土方量计算是土地开发整理项目中土地平整工程的重要组成部分,其工程量的大小直接影响着工程的预算及投资。本文通过建立理想模型,对土方量的计算精度进行了分析、探讨。并以国家投资重点项目——山西省隰县土地开发整理项目为例进行示范研究,通过分析对提高土方量计算精度提出了一些观点和建议。The earthwork quantity calculation is an important part of the land leveling work in land development and consolidation project. The size of the quantity of the project directly affects budget and investment. By establishment of an ideal model, a series of analysis and discussion for earthwork quantity calculation accuracy were performed. And a case study of national investment project, land development and consolidation project in Xi County, Shanxi province, was studied. Some suggestions were put forward to improve the precision of earthwork quantity calculation.
分 类 号:P25[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28