检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]水利部水利水电规划设计总院,北京100120
出 处:《水利水电技术》2009年第11期10-14,共5页Water Resources and Hydropower Engineering
摘 要:水利工程前期工作是工程建设与管理的基础,近几年水利行业迎来了前所未有的大发展,水利前期工作成果丰硕,但也存在着前期工作质量下滑的局面。文中就水利前期工作质量下滑的原因和解决措施进行了探讨。The pre-phase work is the foundation for the construction and management of water project. At present, an unprecedented development of the construction of water project has appeared in China. Though remarkable achievement has been obtained during the pre-phase work of water project, the decrease of the quality of the work is presented therein ; for which the causation of the problems and the measures to solve them are discussed herein.
分 类 号:TV221[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117