有限元法在浅埋暗挖输水隧洞衬砌受力研究中的应用  被引量:5

Application of FEM to study on stress status of lining for shallow-buried and underground-excavated water conveyance tunnel

在线阅读下载全文

作  者:翟明杰[1] 穆咏梅[1] 石维新[1] 

机构地区:[1]北京市水利规划设计研究院,北京100048

出  处:《水利水电技术》2009年第11期76-79,共4页Water Resources and Hydropower Engineering

摘  要:以南水北调中线北京段浅埋暗挖输水隧洞施工为研究实例,使用三维有限元程序ADINA对隧洞衬砌在施工期及运行期不同工况下的受力状态进行了分析计算,得到了工程设计中比较关心的弯矩和轴力等内力计算结果,为工程设计提供参考。Taken the construction of the shallow-buried and underground-excavated water conveyance tunnel within Beijing Section of the Mid-route of the South-to-North Water Transfer project as an actual studying case, the stress status of the tunnel lining during the eonstruction and under different operation conditions are analyzed and calculated with the 3D finite element program ADINA, and then the calculation results of the internal forces such as bending moment, axial force, etc. concerned in the design of the project are obtained; which can be provided as the references for the design.

关 键 词:浅埋暗挖输水隧洞 有限元法 隧洞衬砌 应力状态 南水北调中线工程 

分 类 号:U45[建筑科学—桥梁与隧道工程] TV68[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象