陈村拱坝 105 缝对坝体异常变形影响成因分析  

Genetic Analysis to Chenchun Arch Dam Unusual Deformation Caused by Cracks at El.105m

在线阅读下载全文

作  者:陆绍俊[1] 沈长松[1] 

机构地区:[1]河海大学水利水电工程学院

出  处:《水利水电科技进展》1998年第4期23-25,30,共4页Advances in Science and Technology of Water Resources

摘  要:结合陈村重力拱坝原型观测资料,对带缝坝体异常变形成因进行分析。研究表明:陈村拱坝105裂缝扩展、左坝肩基岩相对软弱、大坝所处高温低水位不利运行工况以及坝体特殊结构型式是产生异常变形的原因。建议实际运行时应调控水位,避免不利运行工况。In the light of the prototype observation data of Chenchun gravity arch dam,the causes of the unusual deformation of the dam with cracks are analysed.The research shows that the opening of crack El.105m the relative soft and weak bed rock of the left abutment,unfavourable operation conditions-high temperature and low water level and the special structure of the dam can be regarded as the causes of unusual deformation.It is necessary to take measures to control the water level to avoiol unfavorable operation conditions.

关 键 词:混凝土坝 拱坝 变形 裂缝 运行工况 观测 

分 类 号:TV698.11[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象