检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江西理工大学建筑与测绘工程学院,江西赣州341000 [2]江西铁山垅钨业有限公司,江西赣州341512
出 处:《有色金属(矿山部分)》2009年第6期11-16,共6页NONFERROUS METALS(Mining Section)
摘 要:贯通是井下矿山开采中一种较为常见的测量工作,它对于全局工作的开展具有极其重要的战略意义。如果贯通顺利,后续工程即可顺利开展,但如果贯通中发生差错,或未能贯通,或贯通时造成过大偏差,则严重影响成巷质量,并在人力、物力、财力及时间上给国家或集体造成很大损失。文中围绕429-345中段副斜井贯通这一主题,就贯通方案的设计及误差预计等方面进行了有益的探讨。The run-through is usually a mine survey work with a strategy meaning for the overall work.If mastering smoothly,the follow-up engineering can immediately smoothly open.If taking place the mistake,or not mastering,or run-through the result having the big deviation,this not only seriously affects lane quantity,but also become the very big loss on the manpower,material resources,and financial power and so on to nation or collective.This text surrounds the topic of 429-345 auxiliary slope-shaft,and proceeds beneficial study to the project choice, error estimate and so on.
分 类 号:TD175[矿业工程—矿山地质测量]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13