检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡仲银[1] 汪雪英[1] 李惠安[1] 杨维九[1] 王伟[1] 曾桂平[1]
出 处:《隧道建设》2009年第5期499-502,509,共5页Tunnel Construction
摘 要:南水北调中线总干渠潮河段隧洞方案为2条平行圆形隧道,隧洞段长18.147 km,净间距26.6 m,设计洞径为12.1 m,采用2台土压平衡盾构机从进、出口相向掘进施工。由于隧洞较长,施工通风比较困难。根据隧洞布置形式、施工方案、主要污染源分析及隧洞施工作业环境的劳动卫生标准,研究计算了洞内需风量和风压,确定了通风方式和风机、风管的技术参数。Chaohe tunnel on Central Route of South-to-North Water Transfer Project consists of twin parallel circular tubes. The tunnel is 18. 147km long. The clear spacing between the twin tubes is 26.6m. The designed diameter of the twin tubes is 12. lm. The twin tubes are to be bored by 4 EPB shield machines from the tunnel portals. Due to the long distance of the tunnel, it is difficult to execute construction ventilation. The required air flow and air pressure are calcu- lated and the required ventilation methods and ventilation parameters are determined on basis of the tunnel layouts, con- struction methods, major pollution sources and health standards of the working environment in the tunnel.
分 类 号:U453.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117