基于电测法的三峡地下厂房天锚荷载应变监测试验研究  

Research on Strain Monitoring Experiment about Up-anchors of Underground Powerhouse of TGP Based on Electrical Measuring Method

在线阅读下载全文

作  者:黄祥[1] 饶志强[2] 宁晶[1] 

机构地区:[1]长江科学院工程安全与病害防治研究所,武汉430010 [2]华中科技大学文华学院,武汉430074

出  处:《长江科学院院报》2009年第12期29-32,共4页Journal of Changjiang River Scientific Research Institute

摘  要:三峡地下厂房天锚作为桥式起重机吊装的重要设施,在投入生产之前采用电测法对其安全性进行了荷载试验检查,并对荷载试验过程中的天锚锚杆受力及其变化情况采用电测法进行了应变监测。监测成果显示,电阻应变计实测规律性明显,且测值均未超过设计允许范围,表明天锚是安全的。The electrical measuring method is one of the methods to use for structural element' s stress analysis in engineering. It' s applied widely for its sizes is small, and measurement operation flexible, and accuracy high. The up-anchors of underground power house of TGP are important facilities used as the handing of a tower crane, so it must be examined in safety by loading experiment before using in production. All together, the stress and its change of up-anchors are monitored during the loading experiment. The achievements show that regularities are significant by real measurement using resistance strain gauges. The measured values are all in the allowable range. It shows that the up-anchors are safety.

关 键 词:电测法 地下厂房 天锚 荷载 应变 监测 

分 类 号:TV698.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象