检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何伟[1] 刘秀平[1] 游萍[1] 陈科文[1] 陈向浩[1]
出 处:《长江科学院院报》2009年第12期89-92,共4页Journal of Changjiang River Scientific Research Institute
基 金:国家自然科学基金项目(50639100);科技部国际科技合作项目(2007DFB60100)
摘 要:通过对某水电站高边坡锚索预应力的系统监测和综合分析,讨论坡积层边坡中锚索预应力张拉、锁定中的损失及其变化规律的时间效应,探求预应力损失的主要影响因素,得到以下结论:①锚索锁定损失与张拉力有关,张拉荷载的规格越高,损失率越小;②锚索预应力损失分迅速下降、缓慢下降、相对稳定3个阶段;③坡积层中锚索预应力损失的主要影响因素是岩(土)体的蠕变,施工、环境因素的影响具有时效性;④本工程区监测数据验证了临时断面监测仪器布置的合理性。On the basis of the systematical monitoring and comprehensive analysis of the prestressed anchorage cable on the high slope of some hydropower station, the prestress loss during construction and after locking are studied, the relationship between the prestress loss and time is discussed, also the main influence factors of the cable prestress loss are researched. The conclusion is as follows: 1. The prestress loss is related with the tension stress. The stronger the force, the less the loss percentage; 2. After being locked, the prestress loss can be divided into three stages: speedy decline stage, slow decline stage and relatively stable stage; 3. The major factor that affects the prestress loss of cable in diluvium slope is the creep of the rock, the influences of construction and environment fac- tors possess time effect ; 4. According to the monitoring data, it is proved that the disposal of the apparatus on provisional monitor section is reasonable.
分 类 号:TV223[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31