检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《长沙铁道学院学报》1998年第3期21-24,共4页Journal of Changsha Railway University
基 金:铁道剖科技司项目
摘 要:本文研究预应力砼连续梁体系自动配束问题,导出了适合于多跨连续梁任意体系转换型式的自动布束的力学方程.并对某三跨连续梁进行了计算,结果表明:采用本论文的调束方法,调束一次完成,不用考虑由于结构体系转换产生的徐变次内力及在超静定结构施加预加力产生的次内力.<ABSTRACT> This paper mainly probes the automatic distribution of steel bunches of pre-stressed concrete continuous beam system and infers the mechanic equations of the automatic distribution of steel bunches applied in random system trans-fermation of multi-span continuous beam. Calculation is made of three-span prestressed concrete continuous beam, Whose result shows that the adjustment of steel bunches can be completed once and for all by employing the above method without the consideration of creep secondary internal forces caused by system transformation and secondary internal forces caused by exerted indeterminate structure.
分 类 号:U448.215[建筑科学—桥梁与隧道工程] U448.35[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3