检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国石油天然气管道局,065000
出 处:《中国科技信息》2009年第23期69-70,共2页China Science and Technology Information
摘 要:新奥法即新奥地利隧道施工方法的简称(New Austrian Tunneling Method,简称为NATM)。在许多隧道施工中,根据各自工程特点成功地应用了新奥法,并取得了较多的经验,积累了大量的实践数据,但在盾构竖井中应用比较少。以仪征─长岭原油管道黄石长江AVN-2440DS盾构隧道竖井工程为实例,详细介绍了新奥法施工技术,为类似工程提供参考。New Austrian Tunneling Method is called NATM for short. In a number of tunnel constructions, applied NATM successfully according to respective project charactiristic, and obtained many experience, accumulated the massive practice data, but applied quite few on the shaft for shield tunnel. The shaft for AVN- 2440DS shield tunnel of Huangshi Changjiang River in Yizheng--Changling crude oil pipeline project is taken as an example in this paper, introduces in detail construction technology with New Austrian Tunneling Method, to serve as a reference for similar projects.
分 类 号:U455.48[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31