燕山水库泄洪洞进水塔施工期观测资料分析  

Analysis of Observational Data during Construction Period of Spillway Tunnel Intake Tower for Yanshan Reservoir

在线阅读下载全文

作  者:李昭辉 何文洲[2] 孙建萍 李成林 

机构地区:[1]河南省燕山水库建设管理局,河南叶县467224 [2]南京水利科学研究院,江苏南京210029

出  处:《水电能源科学》2009年第6期152-154,共3页Water Resources and Power

摘  要:简单介绍了泄洪导流洞监测仪器埋设情况,并从原始观测资料入手对各仪器的观测资料进行了一致性分析和相关性分析,获得了进水塔混凝土施工期和运行期的应力性态,对指导建筑物后期施工和运行管理具有重要意义,并为相关工程设计、施工提供了借鉴。This paper described the embedded situation of monitoring instrument in spillway tunnel. Starting with o riginal observational data, correspondening analysis and correlation analysis among observational data of each instrument were done, and the stress condition of concrete was obtained during intake tower construction and operation period, which is significant to guide later construction and operational management of buildings, and can provide reference for the design and construction of similar projects.

关 键 词:泄洪洞进水塔 误差分析 基准值选取 资料分析 

分 类 号:TV732.1[水利工程—水利水电工程] TV698.1

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象