河南宝泉抽水蓄能电站下水库大坝加高加固的工程经验  被引量:2

The Heightening Reinforcement Engineering Experience for the Lower Reservoir Dam of the Baoquan Pumped Storage Power Station in Henan Province

在线阅读下载全文

作  者:王国秉[1] 鲁一晖[1] 刘致彬[1] 张家宏[1] 胡鹏[1] 

机构地区:[1]中国水利水电科学研究院结构材料研究所,北京100038

出  处:《山西水利科技》2009年第3期1-3,11,共4页Shanxi Hydrotechnics

摘  要:中国水利水电科学研究院承担丰满大坝全面治理可行性研究大坝长期安全性评价工作。为吸取国内外已有工程加固的成功经验,现将河南宝泉抽水蓄能电站下水库大坝加高加固的工程经验进行了较系统的总结,可供类似工程借鉴。The China Institute of Water Resources and Hydropower Research has taken on the working of the long-term safety evaluation of the Fengman dam, which is involved in the Feasibility Research of the All-round Treatment Schedule for the Fengman Dam. In order to study on the experiences of rehabilitation of dams in China and other countries, this paper summarizes the heightening reinforcement engineering experience for the lower reservoir dam of the Baoquan pumped storage power station in Henan province, so as to be referred by the similar projects.

关 键 词:下水库大坝 加高加固 经验总结 

分 类 号:TV543[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象