检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李伙穆[1]
机构地区:[1]黎明职业大学,福建泉州362000
出 处:《建筑技术》2009年第12期1079-1082,共4页Architecture Technology
摘 要:泉州市海峡体育中心体育馆预应力钢索跨度大,质量要求高,工期紧。钢索最大直径规格为7×163,最大长度83m,重约5t。钢索的运输、保护和穿索、挂索是施工难点。施工中对操作平台搭设、拉索放索、拉索两端与耳板安装、索体就位及撑杆下节点安装、预应力钢索张拉施工工艺进行了有效的工艺控制,保证了工程质量及工期。The construction features of Quanzhou Channel Sports Center Stadium are the wide span of its prestressed cables, the high requirement of its construction quality and the short construction period. The specification of maximum cable diameter is Ф7×163, with its longest length of 83 meters and its weight, roughly 5 tons. The difficulties about its construction are the transportation and the protection of the cables as well as the operation of the pitching and slinging of the cables. The effective control in construction over the technical points, such as the layout of the operating platform, the bracing and lowering of the cables, the installation of lifting lugs, the position of cables, the setting of lower joint of spreader bars and the stretching of the prestressed cables, ensure the quality and finishing date of this project.
分 类 号:TU757[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15