检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宁永升[1] 冯树荣[1] 胡育林[1] 石含鑫[1]
机构地区:[1]中国水电顾问集团中南勘测设计研究院,湖南长沙410014
出 处:《水利水电科技进展》2009年第6期83-85,89,共4页Advances in Science and Technology of Water Resources
摘 要:针对溧阳抽水蓄能电站上水库地质条件复杂、地下水位埋藏深、断层节理裂隙发育、库底填渣厚度变化大(0~70m)以及不均匀沉降较大等问题,要求防渗材料适应不均匀变形能力强,建议库底防渗采用柔性体形式以适应较大的不均匀变形。经设计比选,确定选用库底土工膜黏土组合防渗方案,以减少渗漏损失,减少土料弃渣,降低工程造价。Aecording to the complex geological conditions of the upper reservoir, the deep water table, the developed faults and fissures, the large thickness variation of the filling waste in reservoir bottom which ranges from 0 to 70 m and the large uneven settlement, it is required that the impervious material should have a high capacity to suit the differential deformation. The flexible body seepage prevention type is used to meet the arge uneven settlement. Through design and comparison, the combined seepage control scheme of geomembrane and clay was selected so as to reduce the leakage loss and waste slag, as well as the project' s cost.
分 类 号:TV441[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249