检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Jing-hai GONG Xiu-ying YANG Zi-zhao ZHANG Jin-cheng ZHAO
机构地区:[1]Department of Civil Engineering, Shanghai Jiao Tong University, Sharighai 200240, China
出 处:《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》2010年第1期25-33,共9页浙江大学学报(英文版)A辑(应用物理与工程)
摘 要:In this paper,an experimental study of an air inflated membrane was carried out based on the China National Stadium (the Bird's Nest). After the 2008 Olympic Games,it was apparent that the future use of the Bird's Nest would be enhanced if rainfall could be prevented from entering the stadium. The installation of an air inflated membrane across the opening of the steel structure was proposed as a solution to this problem. To verify the scheme,a theoretical analysis and experimental study of an air inflated membrane was carried out. Experimental and computational models were developed,form-finding was carried out using both experimental and theoretical methods,and the results from the two approaches,including the deflection of the air inflated membrane and deformation of the support structure,were analyzed and compared. The force-transfer path and deformation of the air inflated membrane under loads was studied. Conclusions and suggestions are presented.In this paper, an experimental study of an air inflated membrane was carried out based on the China National Stadium (the Bird's Nest). After the 2008 Olympic Games, it was apparent that the future use of the Bird's Nest would be enhanced if rainfall could be prevented from entering the stadium. The installation of an air inflated membrane across the opening of the steel structure was proposed as a solution to this problem. To verify the scheme, a theoretical analysis and experimental study of an air inflated membrane was carried out. Experimental and computational models were developed, form-finding was carried out using both experimental and theoretical methods, and the results from the two approaches, including the deflection of the air inflated membrane and deformation of the support structure, were analyzed and compared. The force-transfer path and deformation of the air inflated membrane under loads was studied. Conclusions and suggestions are presented.
关 键 词:China National Stadium Air inflated membrane FORM-FINDING
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222