检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]新疆伊犁河流域建设管理局,新疆伊犁835000 [2]中水北方勘测设计研究有限责任公司,天津300222
出 处:《土工基础》2009年第6期8-11,共4页Soil Engineering and Foundation
摘 要:大坂隧洞工程为国家大型调水工程,灌溉面积上百万亩,但建设和设计之困难程度国内外罕见,也无先例。采用国内外先进的双护盾TBM掘进技术,使掘进顺利进行,该工程已完成主体工程量的95%以上。为国内外长距离、高埋深软硬岩调水工程的输水方法优化及设计与施工提供借鉴及管理成功的实例。Osaka tunnel engineering, the national large infrastructure construction of water transfer project, has the coverage of effectively irrigated farmland totaling more than one million acreages. It is unprecedented in the world due to the difficulties of design and construction. Owing to adopt the advanced shield tunnel boring machine technology, more than 95 percent of major project has been completed. It is providing reference for optional design and construction management for long-distance, highdepth soft and hard rock water transfer project.
关 键 词:大坂隧洞调水工程 土洞 特软岩 强度应力比 输水隧洞 TBM施工
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28