机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2009年第6期20-23,共4页Yunnan Water Power
摘 要:小湾水电站坝肩抗力体地下洞(井)塞开挖爆破均是在缺陷岩体中进行,在爆破开挖施工过程中,支护、回填灌浆、衬砌(回填)混凝土等工序与开挖爆破交替进行。为避免爆破对其它工序造成影响,保证施工安全,必须要进行相应的爆破试验和安全监测,通过对试验及监测成果数据分析,优选爆破方案。Excavation blasting of the underground cavern(shaft) plugs located in the dam abutment force - resisting masses was al/carried out within defected rock masses in construction of he Xiaowan hydropower project. In the course of blasting and excavation supporting work, backfill grouting, lining(backfilling) and concrete placement were performed al- ternatively. In order to avoid any adverse influence caused by blasting on the working procedure and ensure construction safety corresponding blasting test and safety monitoring were done. The optimum blasting alternative was selected based on the test and monitoring results.
关 键 词:小湾水电站 坝肩抗力体 地下洞(井)塞 爆破试验
分 类 号:TV542[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117