三步沉淀法处理含氰贫液全循环工艺的应用  被引量:6

Application of complete cycle three-step precipitation treatment process of cyanidation lean solution

在线阅读下载全文

作  者:杜淑芬[1] 袁玲[2] 徐克贤[1] 刘晓红[1] 王磊 

机构地区:[1]长春黄金研究院 [2]中国黄金集团公司安全环保部 [3]辽宁新都黄金有限责任公司

出  处:《黄金》2009年第12期56-58,共3页Gold

摘  要:研究提出了三步沉淀法处理含氰贫液全循环工艺,设计和建造了处理能力为100 m3/d的工业试验装置,完成了工业试验,取得了良好的处理效果,实现了含氰污水的"零排放"。在保证金的氰化浸出率同时,最大限度地回收利用了贫液中的氰化钠,同时以难溶沉淀物的形式回收了贫液中大部分有价金属,大大地降低了生产成本。The complete cycle chemical precipitation-purification treatment process of cyanidation lean solution has been proposed. And a 100 m^3/d industrial experimental instrument is designed and constructed., The commercial tests are carr/ed out and good treatment effects are achieved. The aim of zero discharge of cyanide-containing wastewater is realized. The cyanide leaching rate of gold is ensured. Meanwhile, the sodium cyanide in lean solution is recovered in maximum limit and most of the valuable metals in lean solution are recovered as insoluble precipitate. The production cost is cut obviously.

关 键 词:氰化贫液 三步沉淀 全循环 处理工艺 应用 

分 类 号:X751[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象