摘  要:基于早期SOLAR计算机技术的大亚湾核电站KIT/KPS系统存在技术落后、硬件老化、备件采购困难和难以维持正常运行等窘况,因此,必须对其实施国产化升级改造。分别从该项目实施改造的背景、功能需求、软硬件组成和配置、主要功能等方面进行了较为详细的描述,最终采用和利时公司生产的DCSNM系列硬件和MACSVI组态软件研发了新的系统平台。该系统投运后,运行效果良好,全面达到了设计功能需求。The KIT/KPS system of Daya Bay Nuclear Power Plant was based on the early technology of France SOLAR computer in the early 1980s, which revealed its embarrassments of lag in technology, outdated hardware, difficulties in purchasing spare parts , and hard to keep the normal operation at the present, thus its localization and upgrade is necessary. The background of the project, functional requirements, composition and configuration of the hardware and software, as well as the main functions are described in detail. The new system platform has been researched and developed based on DCS NM series hardware and MACS VI configuration software. Having been put into operation, the system is fully satisfying the design specifications, and offers excellent effects.

关 键 词:大亚湾核电站 KIT/KPS系统 国产化升级改造 PUD文件转换 组态软件平台 

分 类 号:TL4[核科学技术—核技术及应用] TP274[自动化与计算机技术—检测技术与自动化装置]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象