检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨旭中[1]
出 处:《电力勘测设计》2009年第6期1-3,共3页Electric Power Survey & Design
摘 要:改革火电机组额定功率定义的问题,继《固定式发电用汽轮机规范》(GB/T5578-2007,以下简称新国标)修编引起的争论之后,在《大中型火力发电厂设计规范》(以下简称大火规)的修编过程中又多次研讨,现将个人认识整理出来,供有关单位决策参考。The problem of reforming thermal power generating units ration power definition, arose dispute since mending of 《Fixed type generated steam turbine criterion》 (GB/T5578-2007,The following is abbreviated as new national criterion), it is discussed time after fine, during the mending process of 《Large medium-sized technical code for designing Thermal power generating plants》 (The following is abbreviated as large thermal power criterion) give order to personal cognition, provide with reference for correlative department decision-making.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15