检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]深圳市广前电力有限公司,广东深圳518054 [2]西安热工研究院有限公司,陕西西安710032
出 处:《热力发电》2009年第12期1-4,共4页Thermal Power Generation
摘 要:结合近年来联合循环发电机组设备性能考核试验中取得的经验,指出目前联合循环发电机组设备采购合同中与设备性能相关的条款存在如性能指标、性能保证边界参数、性能保证条件及验证方法、性能考核试验结果的评判及试验测点和仪表等需进一步明确的问题,给出了完善合同条款的具体要求及建议。Combining with experiences obtained from the equipment assessment tests of combined cycle power generation units in recent years, the problems existing in contract terms related to equipment performance for procuring equipments of combined cycle power generation units,such as the performance norms, the boundary parameters for ensuring the performance, the conditions for ensuring the performance and the method of validation, the evaluation of performance test results, as well as the measuring points and instruments used for tests etc. have been pointed out, the concrete requirements and recommendations for perfecting the contract terms being also given.
关 键 词:联合循环 发电机组 设备采购 设备性能 性能考核试验
分 类 号:TM611.3[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.226.170