Sarma法在石宝铁矿边坡稳定性分析中的应用  被引量:8

Application of Sarma Method in Slope Stability Analysis of Shibao Iron Ore

在线阅读下载全文

作  者:周连春[1] 张世明[1] 祁昊[1] 王政伟[1] 臧建领[1] 

机构地区:[1]内蒙古科技大学矿业工程学院,内蒙古包头014010

出  处:《有色金属(矿山部分)》2010年第1期63-66,共4页NONFERROUS METALS(Mining Section)

摘  要:本文通过对石宝露天铁矿边坡的地质情况和现状进行认真剖析,详细阐述了极限平衡法中的Sarma法的工作原理,并采用Sarma法对石宝露天铁矿中的F区的边坡稳定性进行认真计算,通过计算求出滑动安全系数FJ与标准安全系数Fb比较,判断出边坡的稳定性,并提出安全防范措施,确保安全生产。According to carefully analysis of the geology conditions and current situation of Shibao iron strip mine slope, the principle of the Sarma method which is included in limit equilibrium method in detail is introduced in this paper. At the same time, the slope of F district is computed by the Sarma method. Compared the result of glide safety factor Fj with the standard safety factor Fb, the stability of the slope is determined and the safety precautionary measure.is put forward, then the safety production is ensured.

关 键 词:SARMA法 边坡稳定性分析 应用 

分 类 号:TD854.6[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象