基于IEC61970/61968的发电厂资源CIM建模  被引量:12

CIM of power plant resource based on IEC61970 /61968

在线阅读下载全文

作  者:郑建辉[1] 孟昭勇[2] 林馨 

机构地区:[1]福建电力试验研究院,福建福州350007 [2]山东大学电气工程学院,山东济南250061 [3]莆田电业局,福建莆田351100

出  处:《电力自动化设备》2010年第1期106-109,共4页Electric Power Automation Equipment

摘  要:针对IEC61970/61968标准中未定义发电厂资源的通用信息模型(CIM),根据我国发电厂的特点及应用系统的要求,采用面向对象技术建立了一套火力发电厂资源信息模型。该模型采用UML和Rational Rose建模工具,论述了建模方法、建模准则、模型的建立等关键技术,对模型中的设备模型、励磁系统模型、资源容器模型进行了实例分析。该模型目前只针对燃煤火力发电厂建模。As there is no common information object-oriented CIM(Common Information Model) model of power plant resource in IEC61970/61968,the of thermal power plant resource is built with UML(Unified Modeling Language) and modeling tool "Rational ROSE" according to the characteristics of China's power plants and the requirements of application systems. The modeling methods and rules ,as well as other key technologies ,are discussed. The models of equipment,exciter system and resource container for coal-firing power plant are analyzed with examples.

关 键 词:IEC61970 IEC61968 火力发电厂 发电厂资源 CIM 

分 类 号:TM61[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象