检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北电力大学
出 处:《河北电力技术》1998年第4期6-10,共5页Hebei Electric Power
摘 要:详细推导出了抽水蓄能电站背靠背启动过程的数学模型,利用解耦的方法使得发电机与电动机的状态方程可以分别进行数值计算。模型中考虑了发电机和电动机两机的容量比、励磁电流比、初始相位角和水轮机导叶开度及导叶开启速度对背靠背启动的影响,编制了其通用计算机仿真软件,给出了数字仿真的计算结果。This paper presents a new mathematical model for back to back startup of pumped storage hydro units in detail.Using decoupling method,the state equations for both generator and motor can do numerical calculation individually.The effect of generator to motor capacity ratio and excitation current ratio,initial phase angles,opening and opening rate of wicket gate of the hydraulic turbine on the back to back startup are taken into consideration in the model.A general purpose computer simulation software is prepared,and the calculation results for digital simulation are also presented.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117