检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:方小丹[1] 韩小雷[2] 韦宏[1] 季静[2] 黄超[2] 唐嘉敏[1]
机构地区:[1]华南理工大学建筑设计研究院,广东广州510640 [2]华南理工大学亚热带建筑科学国家重点实验室,广东广州510640
出 处:《建筑结构学报》2010年第1期56-62,共7页Journal of Building Structures
基 金:广东省自然科学基金项目(06105416);华南理工大学亚热带建筑科学国家重点实验室开放研究项目(2008KA01)
摘 要:广州西塔主塔楼高432m,结构形式采用钢管混凝土巨型斜交网格外筒和钢筋混凝土内筒构成的筒中筒结构。斜交网格外筒由不同角度的钢管混凝土柱斜向相贯而成,为了实现节点承载力大于构件承载力的强节点设计原则,提出了两种节点构造形式:加强板+衬板节点和法兰板节点。为了验证两种节点构造的合理性,了解节点实际受力的工作性状、破坏机理和承载能力,进行了8个比例为1∶5.5的节点模型试验,设计并制作了能承受20000kN的自平衡钢结构加载架,采用两个10000kN千斤顶对相贯节点的柱端施加轴向力。结果表明两种构造形式的节点均表现出了约束混凝土的特点,均可满足西塔主塔楼结构设计承载力的要求,具有较高的安全性。相对法兰板节点,加强板+衬板节点对核心混凝土约束作用较大,力学性能较好。The Guangzhou West Tower is an ultrahigh-rise building with a height of 432m, with the structural pattern of a reinforced concrete core tube enclosed by an outer lattice tube made of obliquely crossing concrete filled steel tubular (CFST) columns. To assure that the capacities of connections exceed those of structural components, two details of the eonneetions were proposed and studied. One connection type was reinforcing plate with lining board and the other was connection with flange plates. Eight 1 : 5.5 scale models were tested using a specially designed selfbalancing equipment with two 10000kN capacity jacks and pinion rack, in order to verify the rationality of the details and to investigate the performance, capacity and failure mechanism. Test results indicate that the connections exhibit the characteristic of confined concrete. The connections are validated to meet the design requirement of the Guangzhou West Tower, with sufficient loading capacity. Compared with the connections with flange plates, the connections with reinforcing plate plus lining board have larger confining effects on concrete core and thereby better mechanical behaviors.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222