检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海市电力公司电网建设公司,200002 [2]上海隧道工程股份有限公司,200082
出 处:《特种结构》2009年第6期31-35,共5页Special Structures
摘 要:目前,各类管线被要求采用共同沟或单独的管道方式埋入地下,加剧了地下空间开发利用的深度和难度。结合上海世博电力电缆隧道工程实例,本文介绍了国际上各类新型的盾构工法,分析了可最大限度地实现地下空间开发的各种特殊要求。通过对各种异型盾构工法的研究,解决在隧道施工中遇到的各种难题。At present various types of pipes are required to adopt a common trench or separate pipes buried underground. The depth and diffiulties of the development and utilization of underground space are increased. With cable tunnel project of Shanghai World Expo , new types of international shield methods are introduced in this paper. A variety of special requirements to maximize the development of underground space is analyzed. Through the research of various special - shaped shield, all kinds of problems encountered in tunnel construction are solved.
分 类 号:U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145