检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海市电力公司,200000 [2]上海市电力公司电网建设公司,200002 [3]同济大学土木工程学院地下建筑与工程系,上海200092
出 处:《特种结构》2009年第6期36-39,共4页Special Structures
摘 要:随着电力电缆隧道直径逐渐加大、埋深逐渐加深,在施工过程中会对地表周边环境造成较大的影响。本文利用盾构法隧道施工技术对环境影响小且施工快的优点,结合对上海世博北京西路~华夏西路电力电缆隧道工程监测的数据,并考虑盾构施工的相关因素,采用土体扰动机理,得出了盾构隧道施工过程中地表纵向及横向断面沉降的规律。同时,阐述了如何合理使用peck曲线对横向沉降进行预测,控制施工中地表的沉降。With the gradually increasement of diameter and depth of the power cable tunnels, tunnel construction will course more influence on environment. Based on advantage of the small environmental impact and quick construction, in this paper, using the monitoring data of Beijing West Road - Huaxia West Road Power Cable Tunnel of Shanghai Expo and considering relative factor of construction, the traverse and longitudinal displacement regularity were got by the mechanism of soil disturb. In the meantime, how to use peck curve to predict the traverse displacement so that controlling the ground displacement in construct period was also presented.
分 类 号:U455.43[建筑科学—桥梁与隧道工程] TD327[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222