广州大学城管线竣工测量的技术与管理  

The Technology and Management of Pipeline Surveying of Completed Project in Guangzhou University Town

在线阅读下载全文

作  者:朱德才[1] 张汉春[1] 

机构地区:[1]广州市城市规划勘测设计研究院,广州510060

出  处:《广州建筑》2009年第6期35-39,共5页GUANGZHOU ARCHITECTURE

摘  要:广州大学城位于广州市东南部番禺小谷围岛,面积18km2。广州大学城建设了总长1100km的地下管线,采用了区域供冷、集中供热、综合管沟、分质供水等高新技术,是全国一流的管网设施。本文阐述了大学城管线的管材、设计与施工特点,介绍了竣工测量项目中测量、物探、计算机的关键技术,保证工程质量的多种措施,探索了综合型、特大型管线竣工测量工程质量管理与信息管理的新思路。Guangzhou University Town is located on Xiaoguwei Island, Panyu District in the southeast of Guangzhon, and it covers 18 square kilometers. There is up to 1100 kilometers in total length of pipeline, and new advanced technologies are applied in Guangzhou university town construction including district cooling system, central heating, comprehensive piping system, classified water supply etc. These advanced underground utilities are first-class in our country. These characteristics of pipeline materials, design and construction is introduced. The applied new technique of including survey, geophysical exploration and computer in finish construction survey item is elaborated. Some measures of project quality assurance are expanded. A direction to conduct quality management and data management in construction, especially, large construction is point out.

关 键 词:地下管线 探测 竣工测量 质量管理 

分 类 号:TU990.3[建筑科学—市政工程] TU242.3

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象