机构地区:[1]河海大学水利水电学院,南京210098 [2]南水北调工程建设监管中心,北京100053 [3]中水北方勘测设计研究有限责任公司,天津300222
出 处:《南水北调与水利科技》2009年第6期231-233,共3页South-to-North Water Transfers and Water Science & Technology
基 金:"十一五"国家科技支撑计划重大项目(2006BAB04A403)
摘 要:南水北调东线第一期工程大型低扬程泵站群水泵性能后评估指标的提出,对水泵采购、监造、安装、验收等环节高质量、高标准执行具有指导和促进作用。大型低扬程水泵原型性能后评估内容包括装置效率和振动、噪声水平。基于南水北调工程水泵模型同台测试成果和有关规程规范,提出水泵装置效率、振动及噪声后评估指标。大泵流量测试建议采用内置式超声波流量计;水泵机组固定部件振动量测试应采用振动速度传感器。泵效率测试误差不大于±2.0%。The post-evaluating indexes of pump performances of large low-lift pumps in the Eastern Route of the South-to-North Water Diversion Project in first stage were put forward,which would help progress with high quality and standard in purchasing,supervising,installation and acceptance check of pump.The efficiency and the values of vibration and noise of pump set should be post-evaluated.Based on the production of model pump test in the same test-bed for the South-to-North Water Transfer Project and related codes and specifications,the indexes were put forward.Ultrasonic flowmeter set in inlet passage was suggested to test flow of pump.The vibration of stators of pump set should use vibration velocity sensors.The test error of efficiency of pump should not exceed ±2.0%.
分 类 号:TH38[机械工程—机械制造及自动化] TV68[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222