瀑布沟水电站宽戗堤截流水工模型试验及应用  被引量:7

Hydraulic condition and engineering practice of river closure with broad-crested banquette

在线阅读下载全文

作  者:刘珊燕[1] 刘力中[1] 车清权[1] 

机构地区:[1]长江科学院水力学所,湖北武汉430010

出  处:《人民长江》2010年第2期25-27,共3页Yangtze River

基  金:"十一五"国家科技支撑计划重大项目(2008BAB29B02)

摘  要:为大渡河瀑布沟水电站截流工程选择截流方案进行水工模型试验。试验采用宽戗堤截流,设计戗堤顶宽分别为25 m和60 m的两种试验方案。试验结果表明:龙口水面线第二次跌落时,方案1在戗堤下游坡脚线附近形成的舌状体大于方案2,更能充分利用突扩造成的局部水头损失。因此选择方案1作为最终截流方案。其合理性得到了工程实践的验证,具有一定推广价值。A hydraulic model test was conducted in order to select a reasonable scheme for the river closure project of Pubugou Hydropower Station. We adopted a broad - crested banquette in the model test with two schemes of its crest widths of 25 m and 60 m respectively. The test results show that the tongue - like current formed near dam - toe line in the downstream of the ban- quette in scheme 1 is larger than that in scheme 2 when water surface level at closure gap drops for the second time; therefore, scheme 1 is selected, in which local head loss caused by sudden expansion can be fully used. Scheme 1 has been verified through engineering practice and has a value for popularization.

关 键 词:宽戗堤 截流水力条件 模型试验 瀑布沟水电站 

分 类 号:TV551.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象