强夯法处理巴德格雷天然气处理厂沙漠地基  被引量:1

Dynamic consolidation to manage desert groundsill of natural gas treatment factory in Bardgrey

在线阅读下载全文

作  者:陈怀科[1] 汪国林 程金明[3] 李庆伟[3] 陈龙华[3] 

机构地区:[1]中国寰球工程公司,北京100029 [2]川庆钻探工程公司,成都610051 [3]中冶集团建筑研究总院,北京100088

出  处:《矿产与地质》2009年第6期584-587,共4页Mineral Resources and Geology

摘  要:文章所述工程为土库曼斯坦国天然气处理厂,地处卡拉库姆沙漠腹地,采用强夯法进行地基处理,经检测,各项技术指标完全符合设计要求,在工期极为紧张的条件下,顺利完成了地基处理工作,取得了良好的经济效益和社会效益。该工程的成功实施为沙漠地区的工程建设提供了有益的借鉴作用。The paper states the engineering project of natural gas treatment factory, which is located at the hinterland of Karakum desert in Turkmenistan. Dynamic consolidation is used to treat desert groundsill. The technic guideline is entirely accord with design request after examination. The treatment of groundsill is completed all right in the condition of short time limit. It acquires great economic and social benefit. The succeed implement of the project provides instructive reference to engineering construct in the desert region.

关 键 词:强夯地基处理 地基检测 沙漠地基 

分 类 号:TU272.2[建筑科学—建筑设计及理论] TU472.31

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象