检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩锐[1,2,3] 刘英博[1,2,3] 闻立杰[1,2,3] 王建民[1,2,3]
机构地区:[1]清华大学软件学院,北京100084 [2]信息系统安全教育部重点实验室,北京100084 [3]清华信息科学与技术国家实验室(筹),北京100084
出 处:《计算机研究与发展》2010年第1期157-163,共7页Journal of Computer Research and Development
基 金:国家自然科学基金项目(90718010);国家"九七三"重点基础研究发展计划基金项目(2009CB320700);国家"八六三"高技术研究发展计划基金项目(2008AA042301;2007AA040607)
摘 要:时间管理是工作流管理系统应提供的重要功能,其中一个关键问题是分析时间约束的可行性,并调整时间约束以避免可能出现的违反.然而,在高度不确定的工作流环境下,传统定性的时间约束分析结果过于严格.因此,提出概率时间约束工作流网来描述时间约束下的工作流流程.基于该网提出一种方法,以随机的形式分析活动满足时间约束的概率.该概率能帮助流程管理者灵活地分析时间约束的可行性,进一步为时间约束调整提供精确的指导.此外,用一个实际工作流管理系统中的例子验证工作的有效性.Han Rui,Liu Yingbo,Wen Lijie,and Wang Jianmin(School of Software,Tsinghua University,Beijing 100084) (Key Laboratory for Information System Security,Ministry of Education,Beijing 100084)(Tsinghua National Laboratory for Information Science and Technology(TNList),Beijing 100084) Dealing with time and time constraints is crucial in designing and managing business processes,so time management should be an important part of workflow management systems. One key issue in time management is to analyze the feasibility of time constraints. Besides,when time constraints are violated,they should be adjusted to regain a satisfaction state. Traditional work on time constraint analysis considers discrete activity (execution) durations and presents qualitative analysis result such as time constraints are satisfied or violated. However,the dynamic nature of workflows causes high uncertainties in workflow process,thus activities of workflow process probabilistically satisfy their time constraints,e.g.,95% of activities satisfy their time constraints. Therefore,traditional deterministic analysis is too rigorous. For such an issue,probabilistic time constraint workflow nets (PTCWF-nets) are introduced to describe uncertainties in time-constrained workflow process. Based on PTCWF-nets,a probabilistic approach is proposed at worklow build-time. This approach analyzes every activity's probability of satisfying time constraints in a stochastic way. This quantitative analysis result allows process designer to flexibly check the feasibility of time constraints. The result also provides a precise estimation to guide time constraint adjustment. Moreover,the proposed approach is implemented in a real-world workflow management system,and its effectiveness is evaluated by means of a concrete example.
关 键 词:工作流管理系统 时间管理 流程不确定性 时间约束 概率
分 类 号:TP311.13[自动化与计算机技术—计算机软件与理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.146